YOUR MISSIONYour will contribute to EDF China R&D Center activity on carbon capture and storage (CCS). The whole duration of the internship is expected to be 3 or 4 months, starting from the first quarter of 2013.
YOUR JOBYou will work in the Power Generation team, located at EDF China R&D centre in Beijing.
Your work will focus on carrying a review of CCS technologies with high potential and low technology readiness level, with a focus on related research work carried in China.
You will need to collect relevant information, analyse it and summarise it in a report.
REQUIRED SKILLSEngineering background: chemical or thermal engineering preferred
An experience abroad would be appreciated
Chinese, mother tongue.
Fluent English, written and spoken. French skill is appreciated.
CONTACTSJiahui Lu
Tel: +86-10-58689418
Email: Jiahui.lu@edf.fr
--
修改:lzlybd FROM 118.186.58.*
FROM 118.186.58.*
附件(28.7KB) Intern_Description_EDF_R_D_China_CCS_Dec2013.pdf